Waterproof BioThane Dog Long Lead with Stainless Steel Hardware for Recall Training, Trails and Outdoor Exploring

Waterproof BioThane Dog Long Lead with Stainless Steel Hardware for Recall Training, Trails and Outdoor Exploring

15-Foot
$71.16
Sale price  $71.16 Regular price 
Skip to product information
Waterproof BioThane Dog Long Lead with Stainless Steel Hardware for Recall Training, Trails and Outdoor Exploring
1/5

Waterproof BioThane Dog Long Lead with Stainless Steel Hardware for Recall Training, Trails and Outdoor Exploring

$71.16
Sale price  $71.16 Regular price 
Size

This waterproof BioThane dog long lead gives dogs more room to explore while maintaining a supervised connection for recall practice, distance commands, trail walks, camping and open spaces. The 5/8-inch width keeps the line lighter and easier to manage during longer sessions.

Made with Genuine Beta 520 Standard BioThane, the lead is washable and easy to clean after contact with grass, mud, sand, snow or wet terrain. Stainless steel hardware includes a trigger snap hook and welded D-ring for practical attachment and handling options.

Choose the length that suits your training area: 15 feet, 20 feet, 30 feet or 50 feet. Backwoods Dog describes this line as handcrafted in Ontario, Canada and suitable for dogs that need more freedom without being fully off-leash.

Features

  • 5/8-inch Beta 520 Standard BioThane webbing
  • Waterproof, washable and weatherproof construction
  • Stainless steel trigger snap hook
  • Stainless steel welded D-ring
  • Long-line format for recall training and supervised exploring
  • Vegan, leather-free material described by the source

Specifications

  • Product type: Dog long lead
  • Width: 5/8 inch
  • Available lengths: 15 feet, 20 feet, 30 feet, 50 feet
  • Material: Genuine Beta 520 Standard BioThane
  • Hardware: Stainless steel trigger snap hook and welded D-ring
  • Variants: 15-Foot, 20-Foot, 30-Foot, 50-Foot
  • Brand: Backwoods Dog
  • Origin statement: Handcrafted in Ontario, Canada

Frequently Asked Questions

Which lengths are available for this dog long lead?

The lead is available in 15-foot, 20-foot, 30-foot and 50-foot lengths.

What is the lead made from?

It uses 5/8-inch Genuine Beta 520 Standard BioThane with stainless steel hardware.

Is this lead suitable for recall training?

Yes. Its long-line design is intended for recall practice, distance commands and supervised exploring.

How do I clean the BioThane lead?

Rinse or wash it after exposure to mud, grass, sand, snow or wet terrain, then allow it to dry.

You may also like